The Build Log for Serenity, my cargo trailer conversion.

trailerpanorma.jpg

1.03 Gutted

Tyler Disney June 23, 2017

All of the wall plywood and floor plywood is now out. The only bits left are the two doors, but I'm going to leave those for the moment. 

The frame rust, now that I can see all of it, really isn't as bad as I feared. I'll wire brush it and do the POR-15 rust treatment so this trailer can stay on the road for years to come.

Also, I picked up the tow vehicle on Wednesday:

2017-06-21 16.43.53 HDR.jpg
← How to work on a trailer from two states away1.02 Opening up the walls →

I live in a small metal box on wheels.

This is where I write about the construction process and the experience living in it.


  • January 2019
    • Jan 23, 2019 Photo Tour Winter 2019 Jan 23, 2019
    • Jan 12, 2019 Seven Months In Jan 12, 2019
  • July 2018
    • Jul 14, 2018 A big massive update Jul 14, 2018
  • April 2018
    • Apr 4, 2018 The Shakedown Cruise Begins Apr 4, 2018
    • Apr 4, 2018 The Best Thing That Has Happened to Me in 2018 Apr 4, 2018
    • Apr 3, 2018 Trip Report: Climbing Up and Down the Eastern Sierras Apr 3, 2018
  • February 2018
    • Feb 24, 2018 Building the Bed Feb 24, 2018
    • Feb 24, 2018 The Floor Is In Feb 24, 2018
    • Feb 21, 2018 The Redesign Feb 21, 2018
    • Feb 14, 2018 Ceiling Insulation and Wiring Complete Feb 14, 2018
  • January 2018
    • Jan 12, 2018 Underbelly insulation complete Jan 12, 2018
    • Jan 2, 2018 Progress on the underbelly and ceiling insulation Jan 2, 2018
  • December 2017
    • Dec 21, 2017 Updated renderings Dec 21, 2017
    • Dec 20, 2017 Picking back up where I left off Dec 20, 2017
  • September 2017
    • Sep 22, 2017 Driving across the desert Sep 22, 2017
    • Sep 13, 2017 Finished mounting solar panels Sep 13, 2017
    • Sep 10, 2017 Mounting Solar Panels Sep 10, 2017
    • Sep 8, 2017 Installing a brake controller Sep 8, 2017
    • Sep 2, 2017 Swapping the Axle Sep 2, 2017
    • Sep 2, 2017 Done with the walls Sep 2, 2017
  • August 2017
    • Aug 27, 2017 Insulating the Walls Aug 27, 2017
    • Aug 11, 2017 Building a Composting Toilet Aug 11, 2017
  • July 2017
    • Jul 30, 2017 A Solid Foundation Jul 30, 2017
    • Jul 26, 2017 Updated renders, the least fun part, and a road trip Jul 26, 2017
    • Jul 11, 2017 How to work on a trailer from two states away Jul 11, 2017
  • June 2017
    • Jun 23, 2017 1.03 Gutted Jun 23, 2017
    • Jun 20, 2017 1.02 Opening up the walls Jun 20, 2017
    • Jun 12, 2017 1.01: Demolition Jun 12, 2017
    • Jun 12, 2017 0.2: Rough Design Model Jun 12, 2017
  • May 2017
    • May 25, 2017 Phase 0.1: Trailer purchased May 25, 2017

Want to e-stalk me, but don't have the time? Enter your email here and I'll do it for you.

Thank you!

tylerjd